A Multifactory Integrated Production and Distribution Scheduling Problem with Parallel Machines and Immediate Shipments Solved by Improved Whale Optimization Algorithm.
Vahid AbdollahzadehIsa Nakhai Kamal AbadiSeyyed Mohammad HajimolanaSeyyed Hesamoddin ZegordiPublished in: Complex. (2018)
Keyphrases
- optimization algorithm
- parallel machines
- scheduling problem
- multi objective
- earliness tardiness
- total tardiness
- sequence dependent setup times
- unrelated parallel machines
- single machine
- precedence constraints
- flowshop
- setup times
- optimization strategy
- maximum lateness
- processing times
- evolutionary multi objective
- particle swarm optimization pso
- np hard
- minimize total
- optimization method
- differential evolution
- strongly np hard
- weighted tardiness
- tabu search
- scheduling jobs
- job shop scheduling problem
- production scheduling
- release dates
- open shop
- artificial bee colony
- single server
- genetic algorithm
- production system
- special case
- lot sizing
- swarm intelligence
- probability distribution
- hybrid optimization algorithm
- optimal solution