Determining safety stocks in the presence of workload-dependent lead times.
Seza OrçunSila ÇetinkayaReha UzsoyPublished in: WSC (2007)
Keyphrases
- lead time
- supply chain
- independent and identically distributed
- inventory systems
- service level
- assembly systems
- lot sizing
- stochastic lead times
- random variables
- setup cost
- single item
- single stage
- single product
- poisson process
- total cost
- inventory control
- multistage
- infinite horizon
- holding cost
- lost sales
- stochastic demand
- bayesian networks