Automated lead time estimation for manufacturing networks with dynamic demand.
Ronald G. AskinGirish Jampani HanumanthaPublished in: CASE (2017)
Keyphrases
- lead time
- inventory systems
- supply chain
- single item
- service level
- inventory control
- planning horizon
- assembly systems
- continuous review inventory
- inventory level
- lost sales
- lot sizing
- single product
- production planning
- holding cost
- stochastic lead times
- random variables
- infinite horizon
- total cost
- single stage
- multi item
- stochastic demand
- lot size
- setup cost
- expected profit
- inventory models
- optimal base stock levels
- manufacturing systems