A parallel machine lot-sizing and scheduling problem with a secondary resource and cumulative demand.
Murat GüngörAli Tamer ÜnalZ. Caner TaskinPublished in: Int. J. Prod. Res. (2018)
Keyphrases
- lot sizing
- parallel machines
- inventory systems
- sequence dependent setup times
- scheduling problem
- single item
- setup times
- lead time
- planning horizon
- earliness tardiness
- multi item
- setup cost
- lot size
- total tardiness
- unrelated parallel machines
- multistage
- rolling horizon
- production planning
- precedence constraints
- minimizing makespan
- release dates
- cutting stock
- mixed integer programming
- fixed cost
- single machine
- inventory control
- resource allocation
- list scheduling
- inventory policy
- supply chain
- np hard
- flowshop
- ordering cost
- holding cost
- processing times
- tabu search
- random variables
- production cost
- computational complexity