Sign in

T4P: Hybrid interconnection for cost reduction.

Ignacio CastroSergey Gorinsky
Published in: INFOCOM Workshops (2012)
Keyphrases
  • cost reduction
  • cost savings
  • lead time
  • control system
  • cost function
  • upper bound
  • lot sizing