Login / Signup

Heuristics for the Hybrid Flow Shop Scheduling Problem with Parallel Machines at the First Stage and Two Dedicated Machines at the Second Stage.

Zouhour NabliSoulef KhalfallahOuajdi Korbaa
Published in: ISDA (2017)
Keyphrases
  • parallel machines
  • parallel computing
  • search algorithm
  • distributed systems
  • scheduling problem
  • lot sizing
  • massively parallel