Login / Signup

An HNP-MP Approach for the Capacitated Multi-Item Lot Sizing Problem With Setup Times.

Tao WuLeyuan ShiN. A. Duffie
Published in: IEEE Trans Autom. Sci. Eng. (2010)
Keyphrases
  • multi item
  • setup times
  • lot sizing
  • inventory systems
  • multistage
  • single item
  • production planning
  • multi period
  • mixed integer
  • mixed integer programming
  • lead time
  • planning horizon
  • setup cost
  • lot size
  • parallel machines