The multiple lot sizing problem of a serial production system with interrupted geometric yields, rigid demand and Pentico's heuristic.
Sy-Ming GuuChun-Yi LinPublished in: Ann. Oper. Res. (2018)
Keyphrases
- lot sizing
- production system
- multistage
- production rate
- planning horizon
- rolling horizon
- cutting stock
- inventory systems
- single item
- certainty factor
- mixed integer programming
- multi item
- lead time
- fixed cost
- mixed integer program
- lot size
- production process
- dynamic programming
- production planning
- setup cost
- single stage
- production line
- inventory models
- bin packing
- inventory level
- expected cost
- multiprocessor architecture
- holding cost
- assembly line
- total cost
- manufacturing systems
- cost function
- reinforcement learning
- inventory policy
- service level