Login / Signup
Lotsizing with backlogging and start-ups: the case of Wagner-Whitin costs.
Agostinho Agra
Miguel Fragoso Constantino
Published in:
Oper. Res. Lett. (1999)
Keyphrases
</>
lot sizing
wagner whitin
single item
multistage
multi item
production planning
mixed integer programming
inventory systems
mixed integer
planning horizon
setup cost
lead time
lot size
fixed cost
sequence dependent setup times
branch and bound
holding cost
probability distribution