Login / Signup
The integrated lot sizing and cutting stock problem with saw cycle constraints applied to furniture production.
Matheus Vanzela
Gislaine Mara Melega
Socorro Rangel
Silvio Alexandre de Araujo
Published in:
Comput. Oper. Res. (2017)
Keyphrases
</>
lot sizing
production planning
mixed integer
multistage
mixed integer program
single item
rolling horizon
multi item
lot size
production rate
assembly systems
setup cost
setup times
lead time
cutting stock
supplier selection
integer programming
decision making