Login / Signup

Solution methods for material requirement planning with lot-size dependent lead times.

Raj JagannathanLung S. Juang
Published in: Ann. Oper. Res. (1998)
Keyphrases
  • lead time
  • assembly systems
  • lot sizing
  • lot size
  • np hard
  • setup cost
  • single item