Login / Signup

An optimal production lot-sizing problem for an imperfect process with imperfect maintenance and inspection time length.

Pe-Cheng WangYa-Hui LinYan-Chun ChenJen-Ming Chen
Published in: Int. J. Syst. Sci. (2009)
Keyphrases
  • lot sizing
  • production rate
  • planning horizon
  • production process
  • multistage
  • production system
  • multi item
  • single item
  • learning algorithm
  • decision making
  • mixed integer programming
  • inventory systems