A mathematical model and heuristic algorithms for an unrelated parallel machine scheduling problem with sequence-dependent setup times, machine eligibility restrictions and a common server.
Gulcin BekturTugba SaraçPublished in: Comput. Oper. Res. (2019)
Keyphrases
- mathematical model
- parallel machine scheduling problem
- sequence dependent setup times
- single machine
- scheduling problem
- parallel machines
- flowshop
- total weighted tardiness
- single machine scheduling problem
- setup times
- release dates
- single server
- precedence constraints
- maximum lateness
- lot sizing
- processing times
- special case
- setup cost
- ant colony algorithm
- job shop scheduling problem
- multi item
- tabu search
- feasible solution
- control strategy
- branch and bound algorithm
- multistage