Login / Signup

Prototype design of a multi-agent system for integrated control and asset management of petroleum production facilities.

James H. TaylorAtalla F. Sayda
Published in: ACC (2008)
Keyphrases
  • asset management
  • case study
  • control system
  • database
  • data streams
  • production planning
  • manufacturing process
  • petroleum industry