Lead time selection and the behaviour of work flow in job shops.
Silvanus T. EnnsPublished in: Eur. J. Oper. Res. (1998)
Keyphrases
- lead time
- supply chain
- service level
- inventory systems
- inventory control
- lot sizing
- assembly systems
- single item
- base stock levels
- stochastic lead times
- planning horizon
- random variables
- independent and identically distributed
- setup cost
- infinite horizon
- stochastic demand
- inventory level
- tardiness cost
- total cost
- single stage
- poisson process
- cost reduction
- single product