Performance evaluation of flow lines with non-identical and unreliable parallel machines and finite buffers.
Alexandros C. DiamantidisJun-Ho LeeChrissoleon T. PapadopoulosJingshan LiCathal HeaveyPublished in: Int. J. Prod. Res. (2020)
Keyphrases
- parallel machines
- scheduling problem
- total tardiness
- minimize total
- unrelated parallel machines
- massively parallel
- shared memory
- single server
- precedence constraints
- sequence dependent setup times
- finite number
- flow network
- parallel computing
- release dates
- weighted tardiness
- scheduling jobs
- setup times
- open shop
- production system
- higher order
- flowshop
- single machine
- lot sizing
- genetic algorithm