Simultaneous selection factories, assignment products to factories, lot-sizing and scheduling in distributed permutation flow shop.
Mohammad MohammadiPublished in: Int. J. Math. Oper. Res. (2018)
Keyphrases
- setup times
- lot sizing
- scheduling problem
- sequence dependent setup times
- flowshop
- unrelated parallel machines
- multi item
- parallel machines
- rolling horizon
- multistage
- single item
- precedence constraints
- maximum lateness
- cutting stock
- processing times
- manufacturing cell
- planning horizon
- production planning
- lead time
- single machine
- special case
- setup cost
- single machine scheduling problem
- np hard
- job shop
- release dates
- lot streaming
- dynamic programming
- resource allocation
- single server
- job shop scheduling problem
- production cost