Login / Signup
Optimal order release dates for two-level assembly systems with stochastic lead times at each level.
Oussama Ben Ammar
Alexandre Dolgui
Published in:
Int. J. Prod. Res. (2018)
Keyphrases
</>
assembly systems
release dates
lead time
lot sizing
single machine
optimal control
processing times
dynamic programming
scheduling problem
holding cost
inventory control
single machine scheduling problem
service level
upper bound
supply chain
asymptotically optimal