Login / Signup

Datapath scheduling with multiple supply voltages and level converters.

Mark C. JohnsonKaushik Roy
Published in: ACM Trans. Design Autom. Electr. Syst. (1997)
Keyphrases
  • flexible manufacturing systems
  • higher level
  • knowledge base
  • scheduling problem
  • resource allocation
  • levels of abstraction
  • information retrieval
  • multi agent
  • scheduling algorithm
  • distribution networks