Stochastic joint replenishment problem under a fill rate constraint with controllable lead times and shared cost allocation.
Davide CastellanoLiberatina Carmela SantilloPublished in: Oper. Res. Lett. (2023)
Keyphrases
- lead time
- assembly systems
- optimal base stock levels
- supply chain
- lot sizing
- inventory systems
- periodic review
- inventory control
- single item
- service level
- demand distributions
- stochastic lead times
- stochastic inventory
- poisson process
- single stage
- lost sales
- multistage
- random variables
- single product
- infinite horizon
- customer demand
- independent and identically distributed
- cost function
- sample path
- queue length
- stochastic demand
- lot size
- multi item
- setup cost