Login / Signup

Material handling: simulation based comparison of semiconductor AMHS alternatives: Continuous Flow vs. Overhead Monorail.

Igor PaprotnyJuin-Yan ShiauYo HuhGerald T. Mackulak
Published in: WSC (2000)
Keyphrases
  • material handling
  • production line
  • manufacturing environment
  • cyclic scheduling
  • production system
  • artificial intelligence
  • scheduling problem
  • shop floor
  • case study
  • user interface
  • knowledge discovery