Login / Signup

A Multi-Stage Interleaved Synchronous Buck Converter with Integrated Output Filter in a 0.18µ SiGe process.

Siamak AbedinpourBertan BakkalogluSayfe Kiaei
Published in: ISSCC (2006)
Keyphrases
  • multistage
  • production system
  • stochastic programming
  • lot sizing
  • dynamic programming
  • stochastic optimization
  • control method
  • cost function
  • production line
  • single stage
  • assembly systems