Login / Signup

Analyzing closed Kanban-controlled assembly systems by iterative aggregation-disaggregation.

Jishnu HazraPaul J. SchweitzerAbraham Seidmann
Published in: Comput. Oper. Res. (1999)
Keyphrases
  • assembly systems
  • lot sizing
  • lead time
  • multistage
  • distribution systems
  • inventory control
  • optimal control
  • queueing networks
  • control system
  • decision makers
  • power system
  • release dates