Login / Signup

Lot sizing models with backlog or out-sourcing.

Feng ChuChengbin ChuXiao Liu
Published in: SMC (5) (2004)
Keyphrases
  • lot sizing
  • stochastic inventory control
  • lead time
  • multistage
  • inventory systems
  • rolling horizon
  • multi item
  • single item
  • single machine
  • mixed integer
  • search algorithm
  • production system
  • assembly systems