Corrigendum "Sequencing single-machine tardiness problems with sequence dependent setup times using an iterated greedy heuristic" [Experts Systems with Applications 36 (3P2) (2009) 7087-7092].
Kuo-Ching YingShih-Wei LinChien-Yi HuangPublished in: Expert Syst. Appl. (2010)
Keyphrases
- single machine
- sequence dependent setup times
- scheduling problem
- total weighted tardiness
- maximum lateness
- single machine scheduling problem
- release dates
- total tardiness
- greedy heuristic
- processing times
- minimize total
- weighted tardiness
- setup times
- parallel machines
- np hard
- precedence constraints
- flowshop
- scheduling jobs
- dynamic programming
- lot sizing
- greedy algorithm
- competitive ratio
- optimization problems
- computing systems
- knapsack problem
- multistage