The optimal used period of repairable product with leadtime after the warranty expiry.
Jhy-Ping JhangPublished in: Int. J. Syst. Sci. (2005)
Keyphrases
- lead time
- multi echelon
- base stock policy
- holding cost
- expected profit
- single item
- periodic review
- single product
- planning horizon
- replenishment policy
- inventory systems
- supply chain
- assembly systems
- stochastic demand
- service level
- setup cost
- inventory control
- poisson process
- lot sizing
- customer demand
- base stock policies
- single stage
- infinite horizon
- upper bound
- inventory costs
- random variables
- multi item
- total cost
- demand distributions
- cost function
- dynamic programming
- special case
- production line
- finite horizon
- optimal policy