Login / Signup

Novel Optimizing Approach in the Area of STEP-Based Construction of Sessionless, Power-Constrainted, TAM and Time Optimal Test Schedules.

Josef StrnadelArghya Kumar Dhali
Published in: ECBS (2006)
Keyphrases
  • dynamic programming
  • power consumption
  • case study
  • optimal solution
  • lower bound
  • construction process
  • neural network
  • scheduling problem
  • worst case