Login / Signup

A two-stage heuristic for single machine capacitated lot-sizing and scheduling with sequence-dependent setup costs.

Ik-Soo ShimHyeok-Chol KimHyoung-Ho DohDong-Ho Lee
Published in: Comput. Ind. Eng. (2011)
Keyphrases