Simulation-optimization of inventory control of multiple products on a single machine with sequence-dependent setup times.
Marco Aurélio de MesquitaJoão Vitor TomotaniPublished in: Comput. Ind. Eng. (2022)
Keyphrases
- single machine
- sequence dependent setup times
- scheduling problem
- total weighted tardiness
- release dates
- maximum lateness
- single machine scheduling problem
- setup times
- processing times
- parallel machines
- lot sizing
- precedence constraints
- flowshop
- dynamic programming
- production scheduling
- lead time
- supply chain
- job shop scheduling problem