Resource-constrained unrelated parallel machine scheduling problem with sequence dependent setup times, precedence constraints and machine eligibility restrictions.
Mojtaba AfzaliradJavad RezaeianPublished in: Comput. Ind. Eng. (2016)
Keyphrases
- sequence dependent setup times
- resource constrained
- parallel machine scheduling problem
- precedence constraints
- scheduling problem
- resource constraints
- total weighted tardiness
- parallel machines
- release dates
- branch and bound algorithm
- single machine scheduling problem
- maximum lateness
- single machine
- flowshop
- wireless sensor networks
- sensor networks
- setup times
- job shop
- global constraints
- approximation algorithms
- partially ordered
- partial order
- multipath
- lower bound
- branch and bound
- np hard
- lot sizing
- routing problem
- processing times
- temporal constraints
- supply chain
- special case