Login / Signup
Li-Chih Wang
Publication Activity (10 Years)
Years Active: 2009-2024
Publications (10 Years): 5
2025
2016
Top Topics
2025
2016
Nonlinear Programming
2025
2016
Equality And Inequality Constraints
2025
2016
Exception Handling
2025
2016
Weighted Average
Top Venues
Oper. Res.
Robotics Comput. Integr. Manuf.
Biomed. Signal Process. Control.
Internet High. Educ.
</>
Publications
</>
Li-Chih Wang
,
Kevin Kien-Hoa Chung
The influences of cognitive abilities on self-regulated learning in online learning environment among Chinese university students with learning disabilities.
Internet High. Educ.
62 (2024)
Chi-Hsiang Chou
,
Jyh-Wen Chai
,
Li-Chih Wang
,
Jachih Fu
,
Yu-Shian Lin
,
Pei-Jou Chang
,
Wen-Hsien Chen
Lesion size of early cerebral infarction on a Non-Contrast CT influences detection ability in Cascade Mask Region-Convolutional neural networks.
Biomed. Signal Process. Control.
86 (Part A) (2023)
Li-Chih Wang
,
Chun-Chih Chen
,
Jen-Li Liu
,
Pei-Chun Chu
Framework and deployment of a cloud-based advanced planning and scheduling system.
Robotics Comput. Integr. Manuf.
70 (2021)
Toly Chen
,
Li-Chih Wang
,
Min-Chi Chiu
A multi-granularity approach for estimating the sustainability of a factory simulation model: semiconductor packaging as an example.
Oper. Res.
18 (3) (2018)
Yu-Cheng Lin
,
Toly Chen
,
Li-Chih Wang
Integer nonlinear programming and optimized weighted-average approach for mobile hotel recommendation by considering travelers' unknown preferences.
Oper. Res.
18 (3) (2018)
Li-Chih Wang
,
Yin-Yann Chen
,
Tzu-Li Chen
,
Chen-Yang Cheng
,
Chin-Wei Chang
A hybrid flowshop scheduling model considering dedicated machines and lot-splitting for the solar cell industry.
Int. J. Syst. Sci.
45 (10) (2014)
Li-Chih Wang
,
Chen-Yang Cheng
Development of an integrated demand-supply balancing system for supply chain exception handling.
Int. J. Inf. Syst. Chang. Manag.
7 (1) (2014)
Li-Chih Wang
,
Chen-Yang Cheng
,
Shih-Lun Hsu
A closed-loop feedback simulation for RFID-based manufacturing planning and control system.
Int. J. Inf. Technol. Manag.
12 (1/2) (2013)
Hi-Shih Wang
,
Li-Chih Wang
,
Tzu-Li Chen
,
Yin-Yann Chen
,
Chen-Yang Cheng
Multi-stage Parallel Machines and Lot-Streaming Scheduling Problems - A Case Study for Solar Cell Industry.
APMS (1)
(2013)
Li-Chih Wang
,
Sian-Kun Lin
A multi-agent based agile manufacturing planning and control system.
Comput. Ind. Eng.
57 (2) (2009)
Li-Chih Wang
,
Sian-Kun Lin
,
Li-Ping Huang
A RFID Based Agile Manufacturing Planning and Control System.
RSKT
(2009)