Login / Signup
Kemal Subulan
ORCID
Publication Activity (10 Years)
Years Active: 2012-2024
Publications (10 Years): 14
Top Topics
Decision Variables
Fuzzy Linear Programming
Mip Solver
Transportation Problem
Top Venues
Expert Syst. Appl.
Soft Comput.
Comput. Ind. Eng.
Appl. Soft Comput.
</>
Publications
</>
Adil Baykasoglu
,
Kemal Subulan
,
Ilkim Karaman
A matheuristic-based solution approach for integrated stock selection and sizing problem with a case study in a corrugated box-production company.
Comput. Ind. Eng.
195 (2024)
Kemal Subulan
,
Bilge Varol
,
Adil Baykasoglu
Designing robust capability-based distributed machine layouts with random machine availability and fuzzy demand/process flow information.
Soft Comput.
28 (5) (2024)
Kemal Subulan
,
Bilge Varol
,
Adil Baykasoglu
Unequal-area capability-based facility layout design problem with a heuristic decomposition-based iterative mathematical programming approach.
Expert Syst. Appl.
214 (2023)
Gizem Çakir
,
Kemal Subulan
,
Seyda Topaloglu Yildiz
,
Alper Hamzadayi
,
Ceren Asilkefeli
A comparative study of modeling and solution approaches for the multi-mode resource-constrained discrete time-cost trade-off problem: Case study of an ERP implementation project.
Comput. Ind. Eng.
169 (2022)
Adil Baykasoglu
,
Kemal Subulan
,
Alper Hamzadayi
Capability-based machine layout with a matheuristic-based approach.
Expert Syst. Appl.
198 (2022)
Adil Baykasoglu
,
Nurhan Dudakli
,
Kemal Subulan
,
Ali Serdar Tasan
An integrated fleet planning model with empty vehicle repositioning for an intermodal transportation system.
Oper. Res.
22 (3) (2022)
Kemal Subulan
,
Gizem Çakir
Constraint programming-based transformation approach for a mixed fuzzy-stochastic resource investment project scheduling problem.
Soft Comput.
26 (5) (2022)
Adil Baykasoglu
,
Kemal Subulan
Capability-based distributed layout formation with or without demand and process flow information.
Appl. Soft Comput.
94 (2020)
Kemal Subulan
An interval-stochastic programming based approach for a fully uncertain multi-objective and multi-mode resource investment project scheduling problem with an application to ERP project implementation.
Expert Syst. Appl.
149 (2020)
Adil Baykasoglu
,
Kemal Subulan
A direct solution approach based on constrained fuzzy arithmetic and metaheuristic for fuzzy transportation problems.
Soft Comput.
23 (5) (2019)
Adil Baykasoglu
,
Burcu Kubur Özbel
,
Nurhan Dudakli
,
Kemal Subulan
,
Mümin Emre Senol
Process mining based approach to performance evaluation in computer-aided examinations.
Comput. Appl. Eng. Educ.
26 (5) (2018)
Adil Baykasoglu
,
Kemal Subulan
Constrained fuzzy arithmetic approach to fuzzy transportation problems with fuzzy decision variables.
Expert Syst. Appl.
81 (2017)
Adil Baykasoglu
,
Kemal Subulan
,
Fatma Selen Karaslan
A new fuzzy linear assignment method for multi-attribute decision making with an application to spare parts inventory classification.
Appl. Soft Comput.
42 (2016)
Adil Baykasoglu
,
Kemal Subulan
An analysis of fully fuzzy linear programming with fuzzy decision variables through logistics network design problem.
Knowl. Based Syst.
90 (2015)
Kemal Subulan
,
Adil Baykasoglu
,
Alper Saltabas
An improved decoding procedure and seeker optimization algorithm for reverse logistics network design problem.
J. Intell. Fuzzy Syst.
27 (6) (2014)
Kemal Subulan
,
Ali Serdar Tasan
,
Adil Baykasoglu
Fuzzy mixed integer programming model for medium-term planning in a closed-loop supply chain with remanufacturing option.
J. Intell. Fuzzy Syst.
23 (6) (2012)