Login / Signup
Jimmy Abualdenien
ORCID
Publication Activity (10 Years)
Years Active: 2018-2022
Publications (10 Years): 13
Top Topics
Design Process
Causal Inference
Base Learners
Metamodel
Top Venues
Adv. Eng. Informatics
J. Inf. Technol. Constr.
CoRR
EG-ICE
</>
Publications
</>
Patricia Schneider-Marin
,
Tanja Stocker
,
Oliver Abele
,
Manuel Margesin
,
Johannes Staudt
,
Jimmy Abualdenien
,
Werner Lang
EarlyData knowledge base for material decisions in building design.
Adv. Eng. Informatics
54 (2022)
Xia Chen
,
Jimmy Abualdenien
,
Manav Mahan Singh
,
André Borrmann
,
Philipp Geyer
Introducing causal inference in the energy-efficient building design process.
CoRR
(2022)
Camille Châteauvieux-Hellwig
,
Jimmy Abualdenien
,
André Borrmann
Analysis of early-design timber models for sound insulation.
Adv. Eng. Informatics
53 (2022)
Ata Zahedi
,
Jimmy Abualdenien
,
Frank Petzold
,
André Borrmann
BIM-based design decisions documentation using design episodes, explanation tags, and constraints.
J. Inf. Technol. Constr.
27 (2022)
Jimmy Abualdenien
,
André Borrmann
Ensemble-learning approach for the classification of Levels Of Geometry (LOG) of building elements.
Adv. Eng. Informatics
51 (2022)
Jimmy Abualdenien
,
André Borrmann
Levels of detail, development, definition, and information need: a critical literature review.
J. Inf. Technol. Constr.
27 (2022)
Fritz Beck
,
Jimmy Abualdenien
,
André Borrmann
An evaluation of the strict semantics of owl: sameAs in the field of BIM GIS Integration.
LDAC
(2021)
Stefan F. Beck
,
Jimmy Abualdenien
,
Ihab Hijazi
,
André Borrmann
,
Thomas H. Kolbe
Analyzing Contextual Linking of Heterogeneous Information Models from the Domains BIM and UIM.
ISPRS Int. J. Geo Inf.
10 (12) (2021)
Rohit Kumar Dubey
,
Samuel S. Sohn
,
Jimmy Abualdenien
,
Tyler Thrash
,
Christoph Hoelscher
,
André Borrmann
,
Mubbasir Kapadia
SNAP: Successor Entropy based Incremental Subgoal Discovery for Adaptive Navigation.
MIG
(2021)
Jimmy Abualdenien
,
André Borrmann
Vagueness visualization in building models across different design stages.
Adv. Eng. Informatics
45 (2020)
Jimmy Abualdenien
,
Patricia Schneider-Marin
,
Ata Zahedi
,
Hannes Harter
,
Hannah Exner
,
Daniel Steiner
,
Manav Mahan Singh
,
André Borrmann
,
Werner Lang
,
Frank Petzold
,
Markus König
,
Philipp Geyer
,
Martina Schnellenbach-Held
Consistent management and evaluation of building models in the early design stages.
J. Inf. Technol. Constr.
25 (2020)
Jimmy Abualdenien
,
André Borrmann
A meta-model approach for formal specification and consistent management of multi-LOD building models.
Adv. Eng. Informatics
40 (2019)
Ata Zahedi
,
Jimmy Abualdenien
,
Frank Petzold
,
André Borrmann
Minimized Communication Protocol Based on a Multi-LOD Meta-Model for Adaptive Detailing of BIM Models.
EG-ICE
(2018)