Login / Signup
In-Jae Jeong
ORCID
Publication Activity (10 Years)
Years Active: 2005-2023
Publications (10 Years): 7
Top Topics
Design Thinking
Pareto Set
Solving Multi Objective Optimization Problems
Information Flows
Top Venues
Comput. Ind. Eng.
Int. J. Prod. Res.
Comput. Oper. Res.
APIT
</>
Publications
</>
In-Jae Jeong
A review of decentralized optimization focused on information flows of decomposition algorithms.
Comput. Oper. Res.
153 (2023)
In-Jae Jeong
,
Dongjoo Park
Stochastic programming approach for static origin-destination matrix reconstruction problem.
Comput. Ind. Eng.
157 (2021)
In-Jae Jeong
,
Sumin Jeon
Balanceability of a work-sharing line using floating workers and its comparison with floating work strategy.
Int. J. Prod. Res.
59 (19) (2021)
Evans Sowah Okpoti
,
In-Jae Jeong
,
Seung Ki Moon
Decentralized determination of design variables among cooperative designers for product platform design in a product family.
Comput. Ind. Eng.
135 (2019)
Shinmyeong Kim
,
In-Jae Jeong
Interactive Multi-Objective Optimization Using Mobile Application: Application to Multi-Objective Linear Assignment Problem.
APIT
(2019)
Hang-Min Cho
,
In-Jae Jeong
A two-level method of production planning and scheduling for bi-objective reentrant hybrid flow shops.
Comput. Ind. Eng.
106 (2017)
Jihyun Kang
,
In-Jae Jeong
,
Joon-Bum Kwun
Optimal facility-final exit assignment algorithm for building complex evacuation.
Comput. Ind. Eng.
85 (2015)
Hang-Min Cho
,
Suk Joo Bae
,
Jungwuk Kim
,
In-Jae Jeong
Bi-objective scheduling for reentrant hybrid flow shop using Pareto genetic algorithm.
Comput. Ind. Eng.
61 (3) (2011)
Dong-Ju Lee
,
In-Jae Jeong
Regression approximation for a partially centralized inventory system considering transportation costs.
Comput. Ind. Eng.
56 (4) (2009)
Yooseong Choi
,
In-Jae Jeong
Heuristics for Dynamic Lot-Sizing with Plan Setup Cost in a Rolling Horizon Environment.
ISDA (1)
(2008)
Eun Joo Lee
,
In-Jae Jeong
,
Jeehyoung Lee
Petri Net Based Synthesis Method to Construct Optimal Controllers and Its Application to a Jobshop Scheduling.
ISDA (1)
(2008)
KwanWoo Kim
,
In-Jae Jeong
Flow Shop Scheduling with No-wait Flexible Lot Streaming using Adaptive Genetic Algorithm.
ICCSA Workshops
(2007)
In-Jae Jeong
An Entropy Based Group Setup Strategy for PCB Assembly.
ICCSA (3)
(2006)
Dong-Hyun Baek
,
In-Jae Jeong
,
Chang Hee Han
Application of Data Mining for Improving Yield in Wafer Fabrication System.
ICCSA (4)
(2005)
V. Jorge Leon
,
In-Jae Jeong
An Improved Group Setup Strategy for PCB Assembly.
ICCSA (4)
(2005)