Login / Signup
Ilhem Slama
Publication Activity (10 Years)
Years Active: 2020-2024
Publications (10 Years): 8
Top Topics
Assembly Systems
Lead Time
Monte Carlo
Multistage
Top Venues
ICNSC
APMS (1)
CoDIT
Int. J. Prod. Res.
</>
Publications
</>
Rim Slama
,
Ilhem Slama
,
Houda Tlahig
,
Pierre R. L. Slangen
,
Oussama Ben-Ammar
An overview on human-centred technologies, measurements and optimisation in assembly systems.
Int. J. Prod. Res.
62 (14) (2024)
Ilhem Slama
,
Taha Arbaoui
,
Amir Nourmohammadi
,
Masood Fathi
Assembly Line Balancing with Collaborative Robots Under Uncertainty of Human Processing Times.
CoDIT
(2023)
Oumayma Laouini
,
Ilhem Slama
,
Faicel Hnaien
,
Zied Jemaï
Two-stage Stochastic Program for Capacitated Disassembly Lot-sizing Under Random Yield.
ICNSC
(2023)
Rim Slama
,
Ilhem Slama
,
Pierre Slangen
,
Oussama Ben-Ammar
Advancing human-robot interaction in a manufacturing environment by incorporating hand movements for remote control.
ICNSC
(2023)
Ilhem Slama
,
Oussama Ben Ammar
,
Simon Thevenin
,
Alexandre Dolgui
,
Faouzi Masmoudi
Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times.
Eur. J. Oper. Res.
303 (3) (2022)
Ilhem Slama
,
Oussama Ben Ammar
,
Alexandre Dolgui
,
Faouzi Masmoudi
Genetic algorithm and Monte Carlo simulation for a stochastic capacitated disassembly lot-sizing problem under random lead times.
Comput. Ind. Eng.
159 (2021)
Ilhem Slama
,
Oussama Ben Ammar
,
Alexandre Dolgui
A Model for a Multi-level Disassembly System Under Random Disassembly Lead Times.
APMS (1)
(2021)
Ilhem Slama
,
Oussama Ben Ammar
,
Alexandre Dolgui
,
Faouzi Masmoudi
A Stochastic Model for a Two-Level Disassembly Lot-Sizing Problem Under Random Lead Time.
APMS (1)
(2020)