Login / Signup
Carlos Andrés
Publication Activity (10 Years)
Years Active: 2002-2013
Publications (10 Years): 0
Top Topics
Total Weighted Tardiness
Metaheuristic
Flowshop
Permutation Flowshop
Top Venues
J. Heuristics
Comput. Ind. Eng.
Expert Syst. Appl.
</>
Publications
</>
Carlos Gracia
,
Carlos Andrés
,
Luis Gracia
A hybrid approach based on genetic algorithms to solve the problem of cutting structural beams in a metalwork company.
J. Heuristics
19 (2) (2013)
Salvador Furió
,
Carlos Andrés
,
Belarmino Adenso-Díaz
,
Sebastián Lozano
Optimization of empty container movements using street-turn: Application to Valencia hinterland.
Comput. Ind. Eng.
66 (4) (2013)
Pedro Gómez-Gasquet
,
Carlos Andrés
,
Francisco-Cruz Lario Esteban
An agent-based genetic algorithm for hybrid flowshops with sequence dependent setup times to minimise makespan.
Expert Syst. Appl.
39 (9) (2012)
Rafael Pastor
,
Carlos Andrés
,
Cristóbal Miralles
Corrigendum to "Balancing and scheduling tasks in assembly lines with sequence-dependent setup" [European Journal of Operational Research 187 (2008) 1212-1223].
Eur. J. Oper. Res.
201 (1) (2010)
Carlos Andrés
,
Cristóbal Miralles
,
Rafael Pastor
Balancing and scheduling tasks in assembly lines with sequence-dependent setup times.
Eur. J. Oper. Res.
187 (3) (2008)
Cristóbal Miralles
,
José Pedro García-Sabater
,
Carlos Andrés
,
Manuel Cardós
Branch and bound procedures for solving the Assembly Line Worker Assignment and Balancing Problem: Application to Sheltered Work centres for Disabled.
Discret. Appl. Math.
156 (3) (2008)
Carlos Andrés
,
Pedro Gomez
,
José Pedro García-Sabater
Comparing dispatching rules in dynamic hybrid flow shops.
ETFA
(2006)
Carlos Andrés
,
José Miguel Albarracín
,
Guillermina Tormo
,
Eduardo Vicens
,
José Pedro García-Sabater
Group technology in a hybrid flowshop environment: A case study.
Eur. J. Oper. Res.
167 (1) (2005)
Rafael Pastor
,
Carlos Andrés
,
A. Duran
,
M. Pérez
Tabu search algorithms for an industrial multi-product and multi-objective assembly line balancing problem, with reduction of the task dispersion.
J. Oper. Res. Soc.
53 (12) (2002)
Carlos Andrés
Scheduling in Hybrid Flowshops with Sequence Dependent Setup Times. A MILP Model and a Simulated Annealing Based Approach.
IC-AI
(2002)