Flow shop batching and scheduling with sequence-dependent setup times.
Liji ShenJatinder N. D. GuptaUdo BuscherPublished in: J. Sched. (2014)
Keyphrases
- sequence dependent setup times
- flowshop
- scheduling problem
- single machine
- setup times
- precedence constraints
- total weighted tardiness
- release dates
- maximum lateness
- parallel machines
- total tardiness
- special case
- processing times
- tabu search
- makespan minimization
- unrelated parallel machines
- job shop scheduling
- job shop
- strongly np hard
- scheduling jobs
- single machine scheduling problem
- np hard
- job shop scheduling problem
- genetic algorithm
- production system