Sign in

Scheduling distributed flowshops with flexible assembly and set-up time to minimise makespan.

Guanghui ZhangKeyi XingFeng Cao
Published in: Int. J. Prod. Res. (2018)
Keyphrases
  • scheduling problem
  • single machine
  • peer to peer
  • lightweight
  • flowshop
  • release dates
  • minimizing makespan
  • lower bound
  • np hard
  • distributed environment
  • resource constraints
  • total tardiness