Two-machine flowshop scheduling problem with coupled-operations.
Nadjat MezianiAmmar OulamaraMourad BoudharPublished in: Ann. Oper. Res. (2019)
Keyphrases
- flowshop
- scheduling problem
- minimizing makespan
- processing times
- sequence dependent setup times
- single machine
- flowshop scheduling
- minimizing total tardiness
- makespan minimization
- bicriteria
- setup times
- special case
- maximum lateness
- total tardiness
- tabu search
- total weighted tardiness
- np hard
- precedence constraints
- total flowtime
- flowshop scheduling problems
- preventive maintenance
- permutation flowshop
- job shop
- maximum tardiness
- robotic cell
- job shop scheduling problem
- strongly np hard
- completion times
- unrelated parallel machines
- single machine scheduling problem
- dispatching rule