Interday routing and scheduling of multi-skilled teams with consistency consideration and intraday rescheduling.
Yulia AnoshkinaFrank MeiselPublished in: EURO J. Transp. Logist. (2020)
Keyphrases
- job shop
- scheduling problem
- project scheduling
- shop floor
- routing problem
- network topology
- routing protocol
- shortest path
- consistency checking
- team members
- scheduling algorithm
- ad hoc networks
- np hard
- long term
- multi agent
- real time
- scheduling decisions
- real time database systems
- job shop scheduling problem
- routing algorithm
- resource allocation
- cooperative