Green Scheduling of Jobs and Flexible Periods of Maintenance in a Two-Machine Flowshop to Minimize Makespan, a Measure of Service Level and Total Energy Consumption.
Sadiqi AssiaIkram El AbbassiAbdellah ElbarkanyMoumen DarcherifAhmed El BiyaaliPublished in: Adv. Oper. Res. (2020)
Keyphrases
- flowshop
- service level
- scheduling problem
- preventive maintenance
- dispatching rule
- sequence dependent setup times
- processing times
- manufacturing cell
- setup times
- minimizing total tardiness
- parallel machines
- maximum lateness
- unrelated parallel machines
- bicriteria
- single machine
- minimizing makespan
- total tardiness
- special case
- tabu search
- strongly np hard
- flowshop scheduling
- identical machines
- total weighted tardiness
- job processing times
- number of tardy jobs
- job shop
- supply chain
- lead time
- makespan minimization
- precedence constraints
- np hard
- total cost
- identical parallel machines
- completion times
- job shop scheduling problem
- permutation flowshop
- release dates
- optimal solution