Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence.
F. J. HwangMikhail Y. KovalyovBertrand M. T. LinPublished in: Ann. Oper. Res. (2014)
Keyphrases
- flowshop
- scheduling problem
- sequence dependent setup times
- maximum lateness
- minimizing total tardiness
- job processing times
- setup times
- processing times
- identical parallel machines
- manufacturing cell
- job shop
- parallel machines
- single machine
- bicriteria
- dispatching rule
- fixed number
- unrelated parallel machines
- flowshop scheduling
- total tardiness
- preventive maintenance
- makespan minimization
- special case
- number of tardy jobs
- np hard
- release dates
- precedence constraints
- minimizing makespan
- completion times
- lot streaming
- tabu search
- strongly np hard
- job shop scheduling problem
- flowshop scheduling problems
- robotic cell
- maximum tardiness
- scheduling jobs
- total weighted tardiness
- permutation flowshop
- identical machines
- optimal solution