Scheduling, pricing, and efficiency of non-preemptive flexible loads under direct load control.
Abhishek GuptaRahul JainRam RajagopalPublished in: Allerton (2015)
Keyphrases
- scheduling problem
- scheduling algorithm
- load balancing
- dynamic response
- flexible manufacturing systems
- response time
- control system
- round robin
- load distribution
- flow control
- manufacturing cell
- highly efficient
- processing times
- single machine
- shop floor
- computational complexity
- robotic systems
- optimal control
- control theory
- resource allocation
- np hard