Login / Signup

A novel heuristic algorithm with activity back-shift response model for resource-constrained project scheduling problem.

Buyun ShengHui WangZheng XiaoChenglei ZhangFeiyu ZhaoXiyan Yin
Published in: Soft Comput. (2019)
Keyphrases
  • mathematical model
  • artificial neural networks
  • neural network
  • particle swarm optimization
  • neural network model
  • search strategy
  • prediction model