Sign in

Scheduling Freight Trains in Rail-Rail Transshipment Yards.

Nils BoysenFlorian JaehnErwin Pesch
Published in: Transp. Sci. (2011)
Keyphrases
  • high speed
  • scheduling problem
  • simulation model
  • resource constraints
  • database
  • case study
  • data structure
  • optimal policy
  • round robin
  • flexible manufacturing systems