Job lateness in a two-machine flowshop with setup times separated.
Parthasarati DileepanTapan SenPublished in: Comput. Oper. Res. (1991)
Keyphrases
- flowshop
- setup times
- maximum lateness
- scheduling problem
- sequence dependent setup times
- processing times
- special case
- single machine
- minimizing total tardiness
- bicriteria
- minimizing makespan
- total weighted tardiness
- tabu search
- parallel machines
- unrelated parallel machines
- makespan minimization
- strongly np hard
- total tardiness
- manufacturing cell
- job shop
- np hard
- precedence constraints
- ant colony optimization
- single machine scheduling problem
- scheduling jobs
- lead time
- job processing times