Minimizing the makespan in a 2-machine flowshop with time lags and setup conditions.
Kanta KhuranaP. C. BaggaPublished in: Z. Oper. Research (1984)
Keyphrases
- flowshop
- scheduling problem
- processing times
- flowshop scheduling
- minimizing total tardiness
- special case
- minimizing makespan
- bicriteria
- setup times
- sequence dependent setup times
- maximum lateness
- flowshop scheduling problems
- tabu search
- total tardiness
- makespan minimization
- strongly np hard
- total weighted tardiness
- robotic cell
- optimization problems
- upper bound
- single machine
- ant colony optimization
- genetic algorithm
- np hard
- search algorithm