A Novel Proactive-Reactive Scheduling Approach for the Quay Crane Scheduling Problem: A VUCA Perspective.
Kaoutar CharguiTarik ZouadiV. Raja SreedharanAbdellah El-FallahiMohamed ReghiouiPublished in: IEEE Trans. Engineering Management (2023)
Keyphrases
- scheduling problem
- quay crane
- quay cranes
- container terminal
- single machine
- precedence constraints
- tabu search
- job shop scheduling
- job shop
- flowshop
- processing times
- job shop scheduling problem
- setup times
- parallel machines
- np hard
- list scheduling
- unrelated parallel machines
- identical parallel machines
- viewpoint
- agent architecture
- preventive maintenance
- total tardiness
- parallel genetic algorithm
- limited capacity
- minimizing makespan
- sequence dependent setup times
- release dates
- permutation flowshop
- reactive behavior
- cyclic scheduling
- strongly np hard
- maximum lateness
- context aware
- genetic algorithm