An effective estimation of distribution algorithm for solving uniform parallel machine scheduling problem with precedence constraints.
Chuge WuLing WangXiaolong ZhengPublished in: CEC (2016)
Keyphrases
- precedence constraints
- release dates
- scheduling problem
- parallel machine scheduling problem
- maximum lateness
- sequence dependent setup times
- branch and bound algorithm
- estimation of distribution algorithms
- single machine
- parallel machines
- single machine scheduling problem
- total weighted tardiness
- feature subset selection
- neural network
- processing times
- approximation algorithms
- computing systems
- setup times
- combinatorial optimization
- special case
- optimal solution