Login / Signup

Managing disruptions in aircraft assembly lines with staircase criteria.

Damien LovatoRomain GuillaumeCaroline ThierryOlga Battaia
Published in: Int. J. Prod. Res. (2023)
Keyphrases
  • assembly line
  • assembly line balancing
  • processing times
  • production line
  • beam search
  • supply chain
  • manufacturing systems
  • multi criteria
  • search space
  • parallel algorithm
  • production system
  • precedence constraints